Thank you to everyone who helped out with this project.

The drywall still needs to be taped and mudded. I will drop off the materials today and probably get to it on Wednesday. I am going to see if I have any of the blue paint left and am planning on painting the wall and last two panels of the slot wall with it.
There are plugs behind the microwave and fridge, a counter plug, two in the lounge area and one up on the mezzanine for an overhead plug. There is also two cat 6 drops in the lounge area that go to the rack. They still need to be terminated. I reworked the plumbing including valves in the bathroom to isolate the kitchen sinks.
I am planning on making doors for the cabinets with clear fronts sometime down the road. I will be making additional threads for building out the kitchen and lounge corner.