Skip to main content

Infrastucture

Laser enclosure
Author Last Post

Thanks, luckily the only thing bruised was my ego, haha.

It happens, most importantly I hope you are ok. Great works of the fix!

Apologies in advance, but after I got both backwall sheets of drywall up for the laser room, I stumbled getting off the stepladder and put my elbow into the wall right between two of the studs. I cleaned out the hole and fastened a brace to screw a replacement patch in place, trying to keep it as flush with the existing wall. Made sure I was well away from all of Grant's excellent electrical work. Please see attached photos, sorry if I cannot make it when we are doing the mudding for these rooms.

exciting! thanks for posting and taking pictures :)

Last I saw both the paint booth/laser room were framed out. It's looking good! Pictures attached

What stage is it at? I haven't seen any pictures. Should I be bringing drywall/mudding stuff? Or is it still being framed? What about electrical rough in, if any?

I am also available on the 29th, and either the 30th or 31st (work dependent), if there is work to be done finishing the laser hut. The pics on Facebook look great so far!

I could help on the 29th, or build it without help if someone does the layout and a rough plan for me.

Hi all.


I've bought the lumber to start building the laser enclosure. I'll need help building it. Let me know when you're available to help.

Return to Forum