I meant to make a post sooner. Kyle Rankin and myself did it. Getting the cubbies up on the wall was not to bad, however a huge thank you to the other members who helped drag that table up from the Fab Shop. There are some lights that can be installed under the cubbies and the storage ares can be colour coded, other than that it is done. Hackables were kept low and no hack has been moved to the top. I think a ladder on the third floor may be a good idea as the Design Lab also has high storage.